SPECIALIST VIBRATION TABLES

Vibration table for the production of nozzles in fire resistant concrete for the steel industry

VR for production of nozzles in fire resistant concrete • This vibration table is used in the production of nozzles in fire resistant concrete;
• The nozzles are used for blowing oxygen into the converter during the manufacture of steel;
• The working area is fortified with ribs, which are attached to the vibration tubes as vibration exciters;

Vibration table for large concrete products

Vibration table for large concere products • This vibration table is used for the production of large concrete details such as ceilings, walls, concrete desks and many other products;
• It is designed for the compaction of large products up to and exceeding dimensions of 12 metres by 4 metres;
• The final overall table is created from a series of individual adjustable vibration tables;

Vibration table for the production of railway sleepers

• The vibration table is designed for the production of railway sleepers, which are produced in a 12 metre long mould;
• There are 6 sleepers in each mould;
• The mould is placed across 3 vibration tables and magnetically attached;
• Steel wires are stretched throughout the length of the mould;
• The mould is filled with concrete and compacted by vibration;
• When the concrete is hardened the sleepers are removed from the mould - 6 sleepers x 12 metres long, and the pre-stressed wires are cut;
• The final sleepers are 2 metres each in length;
• No photographs are currently available for this product.
 

Vibration table for the production of stud floors

VT for Stud Floor • This vibration table is used for the production of stud floors;
• It is used to prepare floors suitable for use by animals, where hygiene conditions are important;
• In this situation the concrete panels have small holes on one side and channels on the reverse side;
• As the holes are small they do not cause problems to the legs of the animals;
• Urine and faeces can permeate through the holes and into the drainage system;
• Because of the aggressive nature of the urine and faeces it is necessary to use high quality concrete panels, which must be compacted to a very high standard;